Log in
inloggen bij Cement
Hulp bij wachtwoord
Geen account?
shop word lid
Home / Alle kennis / Artikelen

Queen Máxima Bridge

A sleek and open bridge design Nick Nass, Andre Bouman - 13 juni 2017

In 2016 Mobilis TBI completed the Queen Máxima bridge, an energyneutral tail bridge named after the Dutch queen. It was commissioned by the city of Alphen aan den Rijn and crosses the river Oude Rijn. The implementation of energy-neutral requirements was a unique selling point in the offer of Mobilis TBI. It is achieved by the installation of a field of solar panels that can generate the energy for the moving of the steel bridge parts, lighting and all other equipment.

Reacties

x Met het invullen van dit formulier geef je Cement en relaties toestemming om je informatie toe te sturen over zijn producten, dienstverlening en gerelateerde zaken. Akkoord
Renda ©2024. All rights reserved.

Deze website maakt gebruik van cookies. Meer informatie AccepterenWeigeren